General contracting · Roads & bridges · Infrastructure · Industrial production
Building the infrastructure that moves cities.
A first-class contractor with the Iraqi Ministry of Planning, delivering roads, bridges, water and buildings through an integrated industrial system — from raw material to finished infrastructure.
BAGHDAD · IRQBAGHDAD — IRAQ · 33.31°N 44.36°E
EST. RECORD 2003 — 2026
Who we are
We are not just a contractor — we own the operating capability. Asphalt and concrete plants, polymer-bitumen and emulsion systems, a modern heavy fleet, and engineering crews that deliver from production to handover.
5 Billion
Company capital
IQD
First class
Classification
with the Iraqi Ministry of Planning
0
Delivering since
0+
Documented projects & contracts
completed and ongoing (2003–2026)
0
Plants & production systems
asphalt, concrete, polymer bitumen, emulsions, gravel, sand & crushers
0+
Registered machines & vehicles
in the industrial asset registry
02Capabilities
An integrated operating system
From material production to infrastructure delivery — engineering and industrial capability under one management.
03From material to infrastructure
Engineered to deliver
An integrated chain that begins with bitumen, asphalt and concrete production, moves through a modern transport and heavy-equipment fleet, and ends with delivered roads, bridges and public infrastructure.
04Selected work
Strategic projects
05Industrial production
Plants & production systems
07Track record
Delivering since 2004
- 2003
The record begins
Mechanical, civil and electrical rehabilitation of the Sheikh Hamad water-treatment plant in Tarmiyah, in cooperation with NCA.
- 2004
First road & bridge projects
Construction of the second carriageway of the Balad entrance (5 km) with a concrete bridge under the reconstruction programs.
- 2008
Water infrastructure program
Rehabilitation of a series of water pumping stations (Yousifiya, Siyafiya, Hor Rajab, Sakhrija, Khtemiya, Manari) and water pipeline extensions.
- 2011
Major building works
Construction of five model detention facilities for the Counter-Terrorism Service, valued above IQD 10 billion.
- 2014
Baghdad Mayoralty works
Delivery of the Zublin line, valued above IQD 13 billion, for the Baghdad Mayoralty.
- 2022
Industrial expansion
A 51% stake in the Khebra Road refinery for oxidized bitumen, and concrete (New Jersey) barrier works for Expressway R6.
- 2023
First AMMANN plant & supply contracts
Commissioning of the 240 t/h AMMANN asphalt plant in Yousifiya and delivery of a series of bitumen and emulsion supply contracts for Expressway R6.
- 2024
Baghdad congestion-relief program
Surfacing of the Qods/77, Rasheed Camp, Yousifiya, Nisour and Qahtan flyovers and the Baghdad Airport Road, with a 2024 Vogele paver fleet.
- 2025
Al-Nuba'i site & next-generation plants
Commissioning of the 260 t/h AMMANN plant at Al-Nuba'i, the 2025 polymer-bitumen and emulsion systems, and new WIRTGEN milling machines.
- 2026
Work in progress
Paving, milling and crack treatment on Expressway No. 1 — Section R4 / Phase II.